Structural Ground Floor Reconfiguration

A narrow kitchen and divided living areas become one connected ground floor. Behind the white oak, plaster and veined marble is a carefully coordinated transformation of the structure, plumbing and brick exterior.

The designer’s walkthrough

See the plan come together.

Join Talha Gursoy from the first walkthrough through demolition, structural work and the finished kitchen. The story follows the decisions that made the new plan possible, including the work that is now hidden above the ceiling.

  • Opening the kitchen to the dining and family rooms
  • New beams, relocated services and revised brick-wall windows
  • White oak cabinetry, a working island and carefully selected marble

01 / The starting point

Good rooms, separated.

The existing kitchen had already been updated with white cabinetry, but its position within the house limited how it worked. Long and narrow, it felt like a passage. Someone preparing a meal was separated from people in the dining room or family room, even though the combined ground-floor area was generous.

The brief was to bring those everyday spaces into a shared plan. Removing two dividing walls would give the kitchen a broader footprint and open the sightlines between cooking, dining and relaxing. The foyer and private office areas could retain their separation, while the rooms used together gained a more direct relationship.

Before

Original solid dividing wall with a sideboard and a narrow doorway into the kitchen
The original wall allowed only a narrow connection to the kitchen.

After

Finished Arlington kitchen with a beige storage island, white oak cabinets and two windows flanking the plaster hood
The island and range wall now belong to one connected living space.

The finished kitchen is visible from the adjoining living area. These views show the change in connection from different camera positions.

02 / Planning the change

Resolve the plan before the finishes.

The design studies organize the kitchen around a long range wall and an island of approximately ten feet. The sink moves to the island, opposite the cooking area. A roughly four-foot working aisle gives those two zones room to operate, while the surrounding passages connect to the adjacent rooms.

The island was deliberately planned without stools. With a dining area and breakfast nook already nearby, additional seating would compete with circulation. Storage and a generous preparation surface offered more value here. That decision shaped the cabinetry on the living-room side as well as the space around it.

The elevation brings the windows, hood, shelf, tall appliance storage and paneled refrigerator into one composition. The client presentation render then tests the warmth of the wood against the pale island and sculptural hood. The drawings and render record the design intent; the photographs show how the materials and details developed in the completed room.

Plan study

Hand-drawn kitchen plan showing the range wall, island sink and circulation dimensions
The plan study places the sink opposite the range and preserves movement around the storage island.

Elevation study

Hand-drawn range-wall elevation with paired windows, hood, tall storage and refrigerator below a beam
The elevation coordinates the hood and windows with the cabinetry, including the refrigerator position beneath the beam.

Client presentation render

Client presentation rendering of the white oak kitchen with a pale island and plaster hood
The render helped the client see the proposed proportions and material relationships.

After

Completed kitchen with marble island and backsplash, white oak cabinetry and plaster hood
The completed kitchen carries the same arrangement into real materials, with the final stone, lighting and hardware selections.

03 / Structure

Opening walls. Keeping support.

A structural engineer identified one of the dividing walls as load-bearing. Its removal therefore depended on a new beam-and-column arrangement. The other wall carried no structural load, but it still contained services that had to move. Each opening required its own construction plan.

Temporary support walls held the floor structure above while the crew installed the new LVL beam. The construction photographs make the sequence visible: the original enclosure gives way to temporary framing, then to permanent beams and posts. A central column remains part of the completed structural arrangement.

The design works with that structure. The beams define transitions between the kitchen and adjoining rooms, while the remaining supports are incorporated into the finished openings. The result is a much broader visual connection across the ground floor, with the load path resolved before the cabinetry and finishes arrive.

Temporary support

Crew building temporary support framing along the former dividing wall
Temporary framing supported the joists during the structural work.

Beam installation

LVL beam viewed lengthwise between temporary support walls
The new beam was installed within the temporarily supported opening.

Permanent structure

Installed LVL beam and central post with the crew working below exposed ceiling plumbing
The LVL beam, central post and ceiling services show how closely the structural and mechanical work intersected.

The new opening

Open view from the kitchen toward the family room through the installed beam and post
Once the dividing wall was removed, the family room became part of the kitchen’s field of view.

04 / The exterior wall

A new rhythm in the brick wall.

Moving the range to the exterior wall created a conflict with the existing broad window. The solution was to close that opening and create two narrower windows, one on each side of the range and hood. Their positions establish the symmetry of the finished wall while keeping daylight at the cooking area.

This was an exterior alteration as well as an interior layout decision. New framed openings and headers had to align with the cabinet plan, and the brickwork had to be opened around them. Existing pipes in the wall also crossed the proposed window locations, so their relocation was part of the same operation.

The exterior photograph records the masonry work in progress: the new openings are cut through the brick, and the former window area is being enclosed. Inside, the finished pair of windows makes the hood feel intentional and gives the range wall a balance that the original opening could not provide.

Original opening / early demolition

Original broad window in the stripped kitchen wall with exposed pipes and wiring
The original broad window occupied the wall needed for the new range position.

Reframing

New narrow window headers framed around the original wide window opening
The new headers and openings were laid out in relation to the future range and hood.

Exterior work in progress

Brick exterior with new window openings and weather-protected infill at the former window
New openings and the former window infill are visible from outside, before the masonry work was complete.

After

Finished plaster hood and range centered between two narrow windows
The new windows frame the cooking area and bring daylight to either side of the hood.

05 / Behind the ceiling

The hidden work makes the plan possible.

Opening the walls revealed the systems that the original partitions had concealed: wiring and switches, water and gas lines, ductwork, and a drain serving the primary bathroom above. Removing the walls meant finding new routes for those services across the newly opened ground floor.

The bathroom drain was redirected through the ceiling area toward another route down. A boxed-out vent was also addressed, with the outlet moved to the floor so the old enclosure could be removed. The island introduced new plumbing and electrical locations, requiring access beneath the floor as well as above it.

At rough-in, the important relationships could still be checked together: window positions, the hood centerline, island clearance and outlet locations. The project walkthrough records the rough-in inspection milestone before the walls were closed. Drywall then concealed the coordinated services, and flooring work joined areas that had previously ended at walls or cabinetry.

Exposed conditions

Original dividing-wall framing with headers, electrical cables and ductwork visible
The stripped partitions reveal why opening the plan involved more than removing drywall and studs.

Coordinated rough-ins

Exposed ceiling drain, window framing and island plumbing in the opened floor
Ceiling drainage, the new window wall and the island services were coordinated before enclosure.

After enclosure

Panoramic drywall-stage view of the connected kitchen and living spaces with the central column retained
With the walls and ceiling enclosed, the new relationship between the rooms becomes legible.

06 / Everyday use

An island built for working.

The island gives the kitchen a substantial preparation area, a sink and storage facing both the working aisle and the living space. Paneled ends and doors on the outward-facing side make it read as a complete piece of furniture. Keeping stools out of the surrounding passages supports the movement between the family room, dining area and kitchen.

The perimeter cabinetry uses rift-cut white oak in a medium tone that sits comfortably against the darker floor. One-inch-thick doors with quarter-inch slim Shaker trim give the fronts a precise edge without a heavy frame. The pale island repeats the door language in a contrasting finish.

Tall cabinetry balances the two ends of the range wall. On one side, pocket doors allow the coffee and small-appliance station to close away. On the other, panels integrate the refrigerator beneath the beam. A small open niche provides a place for cookbooks, and the drawers organize frequently used tools close to the preparation and cooking zones.

Island installation

Island cabinet boxes and paneled fronts installed before the countertop
The island’s outward-facing storage is established before the stone top is fitted.

Cabinetry detail

White oak base cabinets with slim framed doors and drawers before countertops
The slender door frames and drawer proportions carry through the perimeter cabinetry.

After

Open appliance cabinet containing a toaster oven, blender and coffee equipment
The appliance station keeps everyday equipment together and can be closed behind pocket doors.

After

Paneled refrigerator below the finished ceiling beam beside the open kitchen
The tall refrigerator is integrated into the cabinetry and coordinated with the beam overhead.

07 / Material decisions

Let the stone lead.

The marble became the visual center of the kitchen. Finding the slab meant considering its dimensions as carefully as its color: it needed to suit the large island and provide the veining the design called for. Purple and gray movement gives the pale room depth, with the wood providing a warmer, quieter counterpoint.

Behind the range, the stone cuts were selected for the composition they would create. The placement of the veins matters across the backsplash, just as it does along the island edge. A shelf follows the range wall, while the plaster above allows the stone pattern to remain the focus.

The hood was formed on site, with its curved plaster profile developed around the cooking area. Cabinet installation came first, followed by countertop templating and fabrication; plumbing and appliance completion followed the fitted stone. The construction sequence explains how the apparently simple final composition depends on several trades meeting at precisely the right locations.

Hood in progress

Unfinished curved plaster hood between two newly installed windows
The hood’s volume takes shape between the new windows before the stone and final trim are complete.

After

Completed curved plaster hood above the range and boldly veined marble backsplash
Plaster, marble and oak bring texture and contrast to the finished cooking wall.

After

Close detail of purple and gray marble veining at the island edge
The island edge reveals the color and movement that guided the slab selection.

After

Marble backsplash and shelf detail beside the range
Stone movement continues from the work surface onto the range-wall backsplash.

08 / The result

A kitchen connected to the house.

The change is clearest in the views between rooms. The former doorway led into an enclosed, corridor-like kitchen. Today, the working aisle opens toward the breakfast area, and the island faces the adjoining living space. Cooking, conversation and movement can take place within the same connected plan.

The finished ceiling and openings still express the structure, but the pipes and wiring that complicated demolition have disappeared into the construction. The two new windows give the range wall its order, and the cabinetry makes daily storage part of the architecture. Together, those decisions turn a kitchen renovation into a reconfiguration of how the ground floor works.

Before / from the dining area

Original narrow doorway from the dining area into the enclosed tiled kitchen
The old doorway concentrated movement through a narrow connection.

After

View along the finished kitchen working aisle toward the adjoining breakfast area
Looking back toward the adjoining dining space, the finished kitchen has a direct, open connection.

These opposite-direction views explain the relationship between the kitchen and its adjoining spaces.

After

View into the completed kitchen showing the storage island, range wall and finished structural opening
The completed opening frames the kitchen as part of the wider ground floor.

The next transformation could be yours

Let’s bring your
vision home.

Begin your project

Boss Design Center