Contact us today and let’s start planning that bathroom remodeling dream project.
Initial consultation, comprehensive measurements, custom kitchen design, photorealistic 3D renderings, material selection guidance in our showroom, and unlimited design revisions. Your designer stays involved through project completion.
Demolition, structural modifications, plumbing rerouting, electrical updates, HVAC adjustments, and ventilation systems. All permits obtained and managed by our team.
Custom or semi-custom cabinetry, full range of finishes and styles, hardware, and specialized storage solutions like pull-outs and organizers. Installed by experienced craftspeople.
Professional templating, expert installation, backsplash tile design and installation, edge profiles, and sealant application.
Sink and faucet installation, light fixtures and lighting design, under-cabinet lighting, electrical outlets, flooring installation, and paint.
Dedicated project manager and coordinator, weekly meetings during construction, real-time updates through our online system, daily cleanup, and protection of your home during construction.
5-year warranty on structural work and 1-year warranty on all other work, plus ongoing availability for questions after your project is complete.
Your budget should reflect what you actually want to accomplish. If you need to reconfigure your layout, upgrade your appliances, and install custom cabinetry, that's a different conversation than refreshing finishes on an existing layout. A free consultation is the fastest way to understand what your specific project will require.
When comparing quotes from different contractors, look closely at what each quote covers. A lower price that excludes design services, permits, or project management may not be the bargain it appears to be. Our guide on choosing a kitchen remodeling contractor covers what to look for in more detail. At Boss Design Center, our pricing is comprehensive, covering design through construction to completion.
A typical kitchen remodeling project takes 6 to 8 months total: 1 to 2 months for the design phase, 4 to 6 weeks for permitting and scheduling, and 3 to 4 months for construction. For a more detailed breakdown, see our guide to kitchen remodel timelines in Virginia.
Before signing any contract, ask whether the contractor uses allowances or fixed-rate pricing. Allowance-based contracts carry inherent risk because the final cost depends on selections you haven't made yet. Fixed-rate contracts like ours give you a locked-in number before construction starts.
Kitchen remodeling projects at Boss Design Center typically range from $80,000 to $250,000. The total depends on kitchen size, materials, structural changes, and level of customization. Pricing also varies by location within the metro area. For area-specific numbers, see our breakdown of kitchen remodel costs in McLean. We offer free consultations to discuss your project and provide realistic cost expectations.
Labor costs, material costs, and permitting requirements in Northern Virginia, Maryland, and Washington, D.C. are higher than the national average. The D.C. metro area also has stricter building codes and inspection requirements, which add to both cost and timeline. These regulations exist to protect homeowners and ensure quality work.
Our projects start at $80,000 because that reflects the scope of a full design-build kitchen remodel with custom design, quality materials, and comprehensive project management. Smaller-scope projects like cabinet refacing or cosmetic updates may cost less, but those fall outside our design-build model.
Cabinetry is usually the largest single expense, often accounting for a significant portion of the total budget. Countertops and appliances are typically the next largest line items. Structural changes like wall removal or plumbing relocation also add considerably to the total.
Yes. We collect a design deposit before beginning the design phase, which covers measurements, 3D renderings, and scope estimates. A second deposit is collected when the construction contract is signed.
We source 99% of materials for our projects. Major items like cabinets and flooring must come through us. This is a requirement of our design-build model because it ensures design cohesion, quality control, and warranty protection.